Pushed commit styling the new checkbox options on ceased, and and existing PI status / colo ref on connected. |
…will clear set_prewired (if checked) and disable the field.
|
@listerr: just checking on the Port Moves thing - on main I know there was an issue moving a duplex port, onto a different duplex port, just checking if that's the case you fixed or if there's something I missed! Thanks |
afk11
left a comment
There was a problem hiding this comment.
Code reviewed and tested manually, all good
|
@listerr: just checking on the Port Moves thing - was that when you moved one duplex port over another duplex pair? or a different case I maybe didn't cover? thanks |
I think the expected behaviour is to be able to move an existing duplex port to a new unoccupied pair, but when you hit "Save Changes" - nothing happened if the port was duplex. It had to be first split out to simplex ports, then moved, then set back to duplex. I've just checked and it also works moving from Duplex -> Simplex if you select the first port in a simplex pair.
One other tweak you might like to add is to pre-populate, or at least put the current patch panel at the top of the "New Patch Panel" dropdown. Many patch panels have similar identifiers, and it's easy to accidentally move a port to a different panel. (As evidenced by the fact I've just accidentally moved a port from panel 104J.R59.B12.U41F to 104J.R59.B12.U42F .. oops!)
|


This PR makes a number of improvements to Patch Panel Ports editing and workflow and removes some other annoyances.
Port cease / prewired lifecycle
When a port is set to ceased (Using "Set ceased" from either the panel list view or patch panel port view page), new options are presented on the modal:
This eliminates several manual admin steps required:
The process is much easier:
Port moves
Other changes
In addition to the above, I have:
<?= $t->ee( $data ) ?>or equivalent