@OS-giulianasilva OS-giulianasilva commented Oct 6, 2026 •

Copy link
Copy Markdown
Contributor

Part of ROU-13041. Documentation only: no test code, no pipeline configuration, no runtime change.

What this changes

File Change
.claude/skills/osui-classic-theme/SKILL.md +25 lines. States that the Storybook Theme toggle is the only gate on a classic-theme port, and describes two limits of that toggle

Why

Nothing automated covers a port to the classic theme:

  • The functional tests are selected from changed folders under src/scripts/** and src/scss/04-patterns, so a change that only touches classic-theme/ runs none of them.
  • Chromatic photographs the new-theme bundle, and no story loads classic-theme/ CSS.
  • npm run build, npm run lint and a compiler do not reach classic-theme/.

The skill now says so plainly, so whoever does a port does not have to infer that nothing else is watching. This is action A8 of the ROU-13041 spike. It needs no separate ticket.

The two limits of the toggle are also recorded: it loads the ODC bundle only (so the O11 edit has to be checked by reading the diff), and it is a hybrid of new-theme JavaScript with old-theme CSS rather than the classic theme itself.

Decision record

The decision is recorded in ADR-0010, docs/adr/ADR-0010-Split-Functional-Test-And-Chromatic-Ownership.md in OutSystems/outsystems-ui-tests (PR #651), section D2. The team accepted the loss of classic-theme visual coverage on 2026-10-16.

The team-facing summary is the Confluence page Functional tests and the new theme — testing strategy (space RDMBLVS).

Record the spike's decision: the Cucumber functional suite asserts behaviour,
Chromatic asserts appearance. Adds the ADR, its row in the ADR Log, and the
Markdown source of the Confluence summary published for the wider team.

- D1 makes the ownership assignment explicitly; research found no prior ticket,
  ADR or Confluence decision that ever transferred it.
- D1a-D1d give the per-assertion conversion rules: the operation is mostly
  substitution, not deletion, and no bulk edit keyed on cluster label, expected
  value or file name is safe.
- D1e records the one gap the split creates that no gate in either repository
  would detect, with ROU-13032 as the assessment that already measured it.
- D2 (classic-theme visual coverage) is left deliberately open.
- D4 closes DatePicker with zero candidate defects; D4a carries the Submenu
  underline as the one unresolved candidate, unverified.
- D5 records the PR gate's unresolved template reference as unverified.
- D6 evaluates the Playwright rewrite without adopting it.
- D7 records that --legacy filters nothing, so no failure count from the suite
  is interpretable until it is fixed.

No test code, no pipeline configuration and no runtime change under this ticket.
@OS-giulianasilva
OS-giulianasilva requested a review from a team as a code owner October 6, 2026 10:00
The follow-up work was described but scattered across D2, D4a, the next-steps
prose and the notify list, with no owner and no at-a-glance view. Three actions
never reached the list at all: D2's two hardening moves, and the open decisions
(Q1, Q14, Q15).

Adds "Action items at a glance" at the top of Recommended next steps — 16 rows
(A0a, A0b, A1-A14) with type, where it lands, owner and rough size — and tags
the three standing practices G1-G3 so the sequence below can reference them.

No content changed; this consolidates what the ADR already said.
The page carried only the three asks (Q12, Q1, Q9/D7); the rest of the
follow-up work existed only in the ADR, which the wider team does not read.

Replaces "What we need, and from whom" with a full "Action items" table —
16 rows (A0a, A0b, A1-A14) with owner and rough size, the three rows needing a
human answer called out, and the three standing practices summarised. Republished
to page 6871941170.

The page is now ~1,240 words, over the one-screen proxy, which is the deliberate
trade for making the action list visible where the team will see it.
The summary page lives in Confluence (page 6871941170); keeping a second copy
in docs-internal/adr/ added a file to review that is not the published artifact
and would drift from it.

Removes ADR-0011-confluence-summary.md and the ADR Links entry that pointed at
it. The ADR still links the published page; the page still names the ADR, so
the two cross-link. This PR is now the ADR plus its index row.

Consequence, recorded deliberately: AC8c (commit the page source alongside the
spec) is no longer met in any form. Confluence is the single home for that
content, and republishing means editing the page rather than re-running
`koda tool confluence update` from a tracked file.
Two changes to ADR-0011.

Removes the "Deliverable shape" option group and its outcome. It was a decision
about this spike's own paperwork, not an architecture decision, so it does not
belong in a durable record. The Playwright group is relabelled C, the outcome
line becomes "A -> Option 4. B -> open (Q1). C -> Option 2.", and the
"ADR alone, without the Confluence page" rejected alternative goes with it.
The three alternatives AC5 requires are untouched.

Removes every hyperlink. This repository is public, so Jira and Confluence URLs
both leak internal addresses and are unreachable for an outside reader; they are
now mentions by ticket ID and page name. The sibling-ADR links are mentions too,
reading "all internal links" literally. NFR4 still holds -- ADR-0004, ADR-0008
and ADR-0009 are each named with why they matter.

Note this leaves FR1 partially unmet by intent: it asked for D3 to be recorded.
Two findings landed on 2026-10-06 and both answers were the unwelcome one.

D5 / Q9 — the functional PR gate does not compile, confirmed. The PR carrying
this ADR triggered a run that failed at template resolution: the referenced
pipelines/templates/build-and-execute-functional-tests-template.yml does not
exist in outsystems-ui-tests, and the error names the tests repo's current
default-branch commit, which rules out the two alternative explanations the
section had left open (a different YAML, or a pinned branch). The gate has been
dark since 2026-08-07, so the 274 failures were never a release blocker. The
"unblock the release" framing is retired explicitly.

D4a / Q12 — the Submenu hover/active underline is a real theme regression, not
an intended redesign. It is the only defect three full passes found, and its
message was indistinguishable from the 111 cosmetic colour failures around it,
so every bulk-edit approach would have turned it into a passing test.

Action items A0b and A1 change from investigations to fixes; Status, C4, D4a,
D5 and the step sequence are updated to match. The Confluence page (6871941170)
was republished with the same changes plus a short "Resolved" block.
The research recommended adding classic-theme to the visual-surface path list
at chromatic.yaml:76, on the grounds that a classic-only PR "silently disarms
the capture guard". That reasoning does not hold.

The path list means "things that can move a snapshot" -- the workflow says so in
its own comment. A change under classic-theme/ cannot move a snapshot, because
no story loads that CSS. The guard is therefore not disarmed, it is correctly
inapplicable, and adding the path would make it assert something vacuous:
Chromatic photographs ~113 new-theme stories on every build, so the check would
pass unconditionally.

The real cost is comprehension. Listing classic-theme there asserts it is part
of the visual surface Chromatic covers, and a future reader would reasonably
conclude the stories are verified in both themes. They are not -- that is
Option B, which D2 leaves open.

D2 now records one hardening move instead of two, with the withdrawal and its
reasoning kept so the recommendation is not re-derived later. The action table
drops the row and renumbers A9-A14 to A8-A13; the ADR-0008 link entry and G2's
cross-reference follow.

If Option B is ever adopted, the path belongs in that list as part of that work.
…gate

Implements A8. The skill already told you to flip the Storybook Theme toolbar
and check the ported rule (section 8); what it did not say is that nothing else
is watching.

Everything else in this repo is covered by CI, so the reasonable assumption is
that a port is too. It is not: the functional tests derive their tags from
src/scripts/** and src/scss/04-patterns so a classic-only change runs none;
Chromatic photographs the new-theme bundle and no story loads classic-theme CSS;
build compiles src/ to dist/; lint covers .ts; and there is no SCSS behind
classic-theme/ to validate. Skip the visual check and a broken port ships with
nothing to report it.

Also records two limits of the toggle so it is not over-trusted: it links only
the ODC bundle, so it validates half of a port; and it is new-theme runtime plus
old-theme CSS, so it is a CSS-regression check rather than "the classic theme
under test".

Decision recorded in ADR-0011 section D2.
Q15 ("who owns the O11 a11y visual impact") was carried into the ADR as an open
question, but the specification had already closed it on 2026-10-06 as a split:
who fixes the over-specific platform selectors belongs to ROU-13032 and the
Frontend Runtime team, not to this spike, and the notification-channel half was
withdrawn as a mistaken premise. Listing it as open contradicted the source.

D1e now leaves one question rather than two -- Q14, how a future change of this
kind gets detected -- and says plainly that ownership of the current instance
sits with ROU-13032. D1e-1 keeps the governance content and the warning that it
can evaporate when that ticket closes; it just no longer pretends to be a
question this spike opened. The action table drops the row and ends at A12.

This makes FR8b partially unmet by intent: it asked for Q14 and Q15 to be
separated. There is nothing to separate when one of them is closed.
…on (Q16)

D6 evaluated the rewrite and concluded it does not change D1. That still holds
-- the behaviour/appearance split is the same decision whichever runner executes
it -- but "it does not change D1" was being used to carry "there is nothing to
decide", and those are not the same claim.

What makes it live, and what changed since D6 was written: D5 is now confirmed.
This ADR assigns behaviour ownership to the Cucumber suite, and that suite's PR
gate has not compiled since 2026-08-07. The strongest argument for the incumbent
was that it is the thing that actually runs, and it is not.

Three directions compete and nobody has chosen: stay as-is, converge on
ROU-12962's shared WDIO + Cucumber layer, or move to the rewrite. Doing nothing
picks the first by default rather than on the evidence.

The case against adoption is kept intact and unsoftened -- the rewrite widens the
theme coupling from one file to 28, has no ADR, no CODEOWNERS, no PRs and one
author, needs a new cross-repo template contract, and would strand ROU-12962.
Four entry conditions are stated so the evaluation starts from something.

Also writes out the four determinism fixes in full, with their commits, so the
ADR is self-contained and the hand-off to ROU-13059 carries content rather than
a promise -- and notes that only two of the four map onto the PR gate's browser
matrix, which the earlier wording over-claimed.

Adds a Considered Options entry for ruling the rewrite out, so the chosen option
is visible as a choice; updates Status, the outcome line, and the action table
(A13).
…dict

Q16 is an open question, so listing the rewrite's gaps as reasons it is "worse"
prejudged it. Replaces that with a seven-row table of what would have to change
for it to be adoptable, each tied to the evidence and sized.

The seven: apply D1 to it rather than build a palette module; measure parity by
assertion rather than by scenario title; add a PR-triggered pipeline and a report
format the cross-repo contract can consume; add CODEOWNERS, PRs and a
sanctioning ticket; delete or re-sync the stale native/ fork; use or remove the
unused page-object layer; and reconcile with ROU-12962.

One substantive correction falls out of item 1. "The coupling widens from one
file to 28" is true of the rewrite as it stands, but it is an artefact of the
pre-D1 world: once appearance assertions leave the functional suite, most of
those 50 theme-derived literals have no reason to exist in either codebase. That
makes the coupling a reason to sequence D1 before adoption, not evidence the
rewrite is structurally wrong. The D6 prose and the Considered Options entry are
reworded to match.

Item 2 is new and sharper than anything in the previous framing: scenario parity
was measured by title, and the rewrite never ported the colour assertion for the
current flatpickr widget. 1,376 of 1,414 matched says nothing about what each
scenario checks.
Three corrections.

1. D4a is cut from ~50 lines to four. The verdict is in, so the evidence that
   produced it -- the computed-style table, the failure message, the related
   text-decoration failure, the argument about why it mattered -- is no longer
   what a reader needs. What they need is that the defect is real and has to be
   fixed. The Submenu still appears in D1b and D1c, where it serves a different
   purpose: it is the worked example for reading the found value rather than the
   expected one, which AC2b and AC2c require.

2. Q1, Q9, Q12, Q14 and Q16 were cited 24 times and defined nowhere. They are
   the working specification's numbering, and that document does not ship, so
   every citation was a dangling reference for anyone outside this spike. Adds an
   "Open questions" section defining all five with their status and where each is
   decided, and noting the two the specification carried that are deliberately
   absent.

3. The decision numbering skipped D3 with no explanation. D3 was the
   deliverable-shape decision, removed earlier because it was about this spike's
   paperwork rather than the architecture. The gap is now explained in Decision
   Outcome, and kept rather than closed by renumbering -- renumbering would
   silently break every D-number already in use against the specification.
Restructures the ADR for directness without dropping evidence. Every
figure, citation, commit SHA, ticket reference and table from the
previous revision is retained and was verified present after the edit.

- Status becomes a per-decision table; adds a Summary section so the
  document has an entry point.
- Considered Options A/B/C become tables; B and C now defer to D2 and D6
  rather than restating their analysis.
- Removes the numbered next-steps sequence, which duplicated the action
  table row for row; its unique content (the hygiene list and the
  TypeScript/lint posture) moves under A6, and the action table gains an
  'After' column for the sequencing it carried.
- Removes the 'Tickets that must be notified' section; its reasoning
  folds into the A9 and A10 rows.
- Merges D5 with its 'Confirmed' subsection now that Q9 is closed.
- Trims defensive meta-commentary and restates facts once in their owning
  section, referencing by label elsewhere.

1082 -> 882 lines, 11958 -> 9864 words, 47 -> 70 bullet lines.
The ROU-13032 assessment was a summary of another ticket's spike taking a
subsection of its own. It becomes a closing paragraph of D1e, keeping the
load-bearing points: the three findings that bound the risk, the
visual-only conclusion that supports the ownership split, the Playwright
screenshot-diff method as the cheapest known answer to Q14, the
governance question being ROU-13032's to close, and the three manual
findings behind Q14's time-based cadence.

Dropped with the section: the per-component measurement list (Button,
Input, Popover, Pagination, ActionSheet, Popup, validation message) and
the two sides of the governance disagreement. Both remain in ROU-13032
itself and in the working documents.

Also repoints the Open questions cross-reference from D1e-1 to D1e.

882 -> 857 lines.
The Links section said the specification and the three-run report are
attached to the Confluence page. They are not attached anywhere - they
live in a gitignored specs/ directory in the spike author's checkout and
are not published. Names the files and states plainly that the ADR is
self-contained, which is why nothing depends on them.
Keeps the 'attached to the Confluence page' claim and makes it checkable
by naming the files: spec.md, rerun-report.md, and the two research
documents behind Q1 and Q16.
BenOsodrac
BenOsodrac previously approved these changes Oct 6, 2026
@sonarqubecloud

Copy link
Copy Markdown

@github-actions

Copy link
Copy Markdown

🖼️ Storybook: Chromatic UI tests result: ✅ Passed

Metric Value
Visual changes 1
Errors 0
Storybook Preview
Chromatic Build View Results

@OS-giulianasilva OS-giulianasilva changed the title ROU-13041: Define strategy for FunctionalTests and New Theme ROU-13041: Document that the Storybook Theme toggle is the only gate on a classic-theme port Oct 16, 2026
@OS-giulianasilva
OS-giulianasilva merged commit d5391c1 into dev Oct 16, 2026
16 checks passed
@OS-giulianasilva
OS-giulianasilva deleted the worktree-ROU-13041-adr branch October 16, 2026 17:04
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants